Area · Montérégie

Modular construction in Marguerite-D'Youville

Located in Montérégie, the Marguerite-D'Youville MRC groups 6 municipalities for about 83,666 residents. Permits, zoning, module transport: the big questions of a modular project are settled municipality by municipality here — this is where to start.

Estimate costs

Towns with a local guide

All municipalities in the area

Modular construction serves the entire area, including the following municipalities:

  • Sainte-Julie30,987 res. · Julievillois, oise
  • Calixa-Lavallée527 res. · Calixois, oise

Modular in the Marguerite-D'Youville sector

A traditional job site ties up local trades for months; modular flips that logic. Most of the building is completed in a factory, often outside the Marguerite-D'Youville sector, before being moved to the project's municipality. On site, only the foundation, assembly and connections remain — a short job-site footprint, welcome in the territory's smallest municipalities.

Procedures and regulations

Each municipality in the sector keeps its own siting, setback and use standards, within the frame set by the Marguerite-D'Youville MRC's land-use plan. Nothing is uniform from one municipality to the next: before any commitment, verify with the project municipality's planning department that the planned building conforms to the target zone's zoning.

  • The building permit, step by stepPermit procedures for a modular building, from filing the application to the final inspection. View
  • Modular glossaryLand-use plan, zoning, CSA A277, shell finish: the project terms clearly defined. View

Modular builders serving the area

A modular project in the sector does not depend on a local contractor: the building is produced in a factory then moved by road, so most Quebec manufacturers accept deliveries anywhere in the province, including Montérégie. Take the time to compare several offers and validate the RBQ licence.

Partner · Ad

8Module

Modular multi-residential buildings (6 to 24+ units) factory-built in Quebec.

Visit website

Commercial partnership — we may receive compensation. Disclosure

For an overview of the manufacturers active in Quebec, see our modular builders guide.

Frequently asked questions

What role does the Marguerite-D'Youville MRC play in a construction project?
Count on two contacts: the municipality for your lot's permit and zoning, and the Marguerite-D'Youville MRC for the broad planning orientations. In practice, the municipality is almost always the one answering your project questions.
Do you need to target one of the sector's larger municipalities for a modular project?
Nothing forces you to build in a large municipality. Manufacturers deliver everywhere on the Marguerite-D'Youville territory; what decides feasibility is the target zone's zoning and road access to the lot — two points to validate with the municipality concerned.
Where do the modular homes delivered to the sector come from?
Modules come from factories located all over Quebec and travel by truck to the project's municipality. The right criterion is therefore not how close the factory is, but the quality of the offer: request several detailed proposals and confirm the manufacturer's RBQ licence.
Advertisement
Ad space

Local builder?

Join our builder network.

Advertise here

For your project

All articles