Contrecoeur at a glance
| Region | Montérégie |
| MRC | Marguerite-D'Youville |
| Population | 10,695 |
| Area | 88.24 km² |
| Demonym | Contrecoeurois, oise |
| Incorporated | 1976 |
Modular construction in Contrecoeur
Building in Contrecoeur means dealing with the Montérégie climate. That is exactly what factory fabrication avoids: modules are built indoors, without weather interruptions, then transported and set on a permanent foundation. Most of the work is already done by the time your lot becomes a job site.
The total cost of a project in Contrecoeur depends on the land, foundation, connections (water/sewer or well/septic) and transport to the municipality, on top of the building itself. Once set on a foundation, the home finances like any other property.
Read the complete modular home guide · Detailed prices · Choosing a builder
Permits and regulations in Contrecoeur
First things first, the permit: the municipality of Contrecoeur must authorize the project, which remains subject to the Quebec Building Code (RBQ). Zoning sets the permitted setbacks, siting and height. In the factory, fabrication falls under CSA A277 certification; on the lot, the foundation, connections and assembly go through municipal inspection.
Check zoning rules and permit applications directly with the municipality: www.ville.contrecoeur.qc.ca.
Where to find the rules in Contrecoeur
Rules are specific to Contrecoeur and the target zone. Before buying land or ordering modules, confirm these with the relevant authorities:
- Zoning & planning by-laws — Permitted uses, setbacks, height and siting — and whether factory-built homes are allowed in the target zone in Contrecoeur. www.ville.contrecoeur.qc.ca →
- Building permit — Application form, required documents and timelines from Contrecoeur's planning department. www.ville.contrecoeur.qc.ca →
- Regional land-use plan — Regional land-use designations, managed by the Marguerite-D'Youville MRC. View →
- Agricultural zone (CPTAQ) — If the lot is in an agricultural zone, Commission authorization may be required before building. www.cptaq.gouv.qc.ca →
- Septic systems & wells — Off municipal services, Regulation Q-2, r.22 governs septic installations. www.environnement.gouv.qc.ca →
- Building code & RBQ licence — Verify your builder's RBQ licence and Quebec Building Code requirements. www.rbq.gouv.qc.ca →
- Guide: building permits in Quebec — Our step-by-step guide to permit procedures for a modular building. View →
- Modular construction glossary — Zoning, minor variance, CSA A277, turnkey… every project term explained simply. View →
- In person — Contrecoeur city hall: 5000, route Marie-Victorin.
Modular builders serving Contrecoeur
Modular buildings are factory-built then transported to the site, so a builder does not need to be based in Contrecoeur to deliver a project there. Most Quebec factories serve the entire province, including Montérégie. Always verify the company's RBQ licence and get several quotes.
8Module
Modular multi-residential buildings (6 to 24+ units) factory-built in Quebec.
Visit websiteCommercial partnership — we may receive compensation. Disclosure
To compare manufacturers active in Quebec, see our modular builders guide.
Articles mentioning Contrecoeur
Our guides and coverage that mention Contrecoeur or projects in the area.
