Amos at a glance
| Region | Abitibi-Témiscamingue |
| MRC | Abitibi |
| Population | 13,849 |
| Area | 551.18 km² |
| Demonym | Amossois, oise |
| Incorporated | 2025 |
Modular construction in Amos
The principle is simple: the modules of your future home take shape in a factory, under a roof, while the foundation is prepared on your lot in Amos. Delivery follows, then assembly on the permanent foundation. On-site work is shortened, and the weather stops being the factor that dictates the schedule.
The total cost of a project in Amos depends on the land, foundation, connections (water/sewer or well/septic) and transport to the municipality, on top of the building itself. Once set on a foundation, the home finances like any other property.
Read the complete modular home guide · Detailed prices · Choosing a builder
Permits and regulations in Amos
First things first, the permit: the municipality of Amos must authorize the project, which remains subject to the Quebec Building Code (RBQ). Zoning sets the permitted setbacks, siting and height. In the factory, fabrication falls under CSA A277 certification; on the lot, the foundation, connections and assembly go through municipal inspection.
Check zoning rules and permit applications directly with the municipality: www.amos.quebec.
Where to find the rules in Amos
Rules are specific to Amos and the target zone. Before buying land or ordering modules, confirm these with the relevant authorities:
- Zoning & planning by-laws — Permitted uses, setbacks, height and siting — and whether factory-built homes are allowed in the target zone in Amos. www.amos.quebec →
- Building permit — Application form, required documents and timelines from Amos's planning department. www.amos.quebec →
- Regional land-use plan — Regional land-use designations, managed by the Abitibi MRC. View →
- Agricultural zone (CPTAQ) — If the lot is in an agricultural zone, Commission authorization may be required before building. www.cptaq.gouv.qc.ca →
- Septic systems & wells — Off municipal services, Regulation Q-2, r.22 governs septic installations. www.environnement.gouv.qc.ca →
- Building code & RBQ licence — Verify your builder's RBQ licence and Quebec Building Code requirements. www.rbq.gouv.qc.ca →
- Guide: building permits in Quebec — Our step-by-step guide to permit procedures for a modular building. View →
- Modular construction glossary — Zoning, minor variance, CSA A277, turnkey… every project term explained simply. View →
- In person — Amos city hall: 182, rue 1re.
Modular builders serving Amos
Modular buildings are factory-built then transported to the site, so a builder does not need to be based in Amos to deliver a project there. Most Quebec factories serve the entire province, including Abitibi-Témiscamingue. Always verify the company's RBQ licence and get several quotes.
8Module
Modular multi-residential buildings (6 to 24+ units) factory-built in Quebec.
Visit websiteCommercial partnership — we may receive compensation. Disclosure
To compare manufacturers active in Quebec, see our modular builders guide.
Articles mentioning Amos
Our guides and coverage that mention Amos or projects in the area.
Inoccupation sous 1 %, loyers en hausse de 55 % à Val-d'Or depuis 2018, pression minière : pourquoi le modulaire s'impose en Abitibi-Témiscamingue.
Loyers en hausse d'environ 55 % à Val-d'Or depuis 2018, inoccupation à 0,4 % à Saint-Félicien : la mécanique de l'explosion des loyers en région, expliquée sans jargon.
