Rigaud at a glance
| Region | Montérégie |
| MRC | Vaudreuil-Soulanges |
| Population | 8,167 |
| Area | 113.72 km² |
| Demonym | Rigaudien, ienne |
| Incorporated | 1995 |
Modular construction in Rigaud
In Rigaud and the Montérégie region, modular construction is especially suited to residential projects on private land. Modules are built in a factory, sheltered from the weather, then delivered and assembled on a permanent foundation — cutting on-site timelines and weather dependence, two very real constraints outside the major centres.
Comparing factory prices alone would be misleading: a project in Rigaud also includes the land, the foundation, the connections and transporting the modules to the municipality. The good news on financing — once on its foundation, a modular home is treated like any other residence.
Read the complete modular home guide · Detailed prices · Choosing a builder
Permits and regulations in Rigaud
First things first, the permit: the municipality of Rigaud must authorize the project, which remains subject to the Quebec Building Code (RBQ). Zoning sets the permitted setbacks, siting and height. In the factory, fabrication falls under CSA A277 certification; on the lot, the foundation, connections and assembly go through municipal inspection.
Check zoning rules and permit applications directly with the municipality: www.ville.rigaud.qc.ca.
Where to find the rules in Rigaud
Rules are specific to Rigaud and the target zone. Before buying land or ordering modules, confirm these with the relevant authorities:
- Zoning & planning by-laws — Permitted uses, setbacks, height and siting — and whether factory-built homes are allowed in the target zone in Rigaud. www.ville.rigaud.qc.ca →
- Building permit — Application form, required documents and timelines from Rigaud's planning department. www.ville.rigaud.qc.ca →
- Regional land-use plan — Regional land-use designations, managed by the Vaudreuil-Soulanges MRC. View →
- Agricultural zone (CPTAQ) — If the lot is in an agricultural zone, Commission authorization may be required before building. www.cptaq.gouv.qc.ca →
- Septic systems & wells — Off municipal services, Regulation Q-2, r.22 governs septic installations. www.environnement.gouv.qc.ca →
- Building code & RBQ licence — Verify your builder's RBQ licence and Quebec Building Code requirements. www.rbq.gouv.qc.ca →
- Guide: building permits in Quebec — Our step-by-step guide to permit procedures for a modular building. View →
- Modular construction glossary — Zoning, minor variance, CSA A277, turnkey… every project term explained simply. View →
- In person — Rigaud city hall: 106, rue Saint-Viateur.
Modular builders serving Rigaud
Modular buildings are factory-built then transported to the site, so a builder does not need to be based in Rigaud to deliver a project there. Most Quebec factories serve the entire province, including Montérégie. Always verify the company's RBQ licence and get several quotes.
8Module
Modular multi-residential buildings (6 to 24+ units) factory-built in Quebec.
Visit websiteCommercial partnership — we may receive compensation. Disclosure
To compare manufacturers active in Quebec, see our modular builders guide.
