Chertsey at a glance
| Region | Lanaudière |
| MRC | Matawinie |
| Population | 5,683 |
| Area | 302.13 km² |
| Demonym | Chertsois, oise |
| Incorporated | 1991 |
Modular construction in Chertsey
Building in Chertsey means dealing with the Lanaudière climate. That is exactly what factory fabrication avoids: modules are built indoors, without weather interruptions, then transported and set on a permanent foundation. Most of the work is already done by the time your lot becomes a job site.
The total cost of a project in Chertsey depends on the land, foundation, connections (water/sewer or well/septic) and transport to the municipality, on top of the building itself. Once set on a foundation, the home finances like any other property.
Read the complete modular home guide · Detailed prices · Choosing a builder
Permits and regulations in Chertsey
Chertsey's zoning dictates where and how the home can be sited (setbacks, height, placement), and a municipal permit is required before work begins. The Quebec Building Code (RBQ) applies to the whole project; the factory-built portion is governed by CSA A277 certification, while the foundation, connections and assembly are inspected by the municipality.
Check zoning rules and permit applications directly with the municipality: www.chertsey.ca.
Where to find the rules in Chertsey
Rules are specific to Chertsey and the target zone. Before buying land or ordering modules, confirm these with the relevant authorities:
- Zoning & planning by-laws — Permitted uses, setbacks, height and siting — and whether factory-built homes are allowed in the target zone in Chertsey. www.chertsey.ca →
- Building permit — Application form, required documents and timelines from Chertsey's planning department. www.chertsey.ca →
- Regional land-use plan — Regional land-use designations, managed by the Matawinie MRC. View →
- Agricultural zone (CPTAQ) — If the lot is in an agricultural zone, Commission authorization may be required before building. www.cptaq.gouv.qc.ca →
- Septic systems & wells — Off municipal services, Regulation Q-2, r.22 governs septic installations. www.environnement.gouv.qc.ca →
- Building code & RBQ licence — Verify your builder's RBQ licence and Quebec Building Code requirements. www.rbq.gouv.qc.ca →
- Guide: building permits in Quebec — Our step-by-step guide to permit procedures for a modular building. View →
- Modular construction glossary — Zoning, minor variance, CSA A277, turnkey… every project term explained simply. View →
- In person — Chertsey city hall: 333, avenue de l'Amitié.
Modular builders serving Chertsey
Modular buildings are factory-built then transported to the site, so a builder does not need to be based in Chertsey to deliver a project there. Most Quebec factories serve the entire province, including Lanaudière. Always verify the company's RBQ licence and get several quotes.
8Module
Modular multi-residential buildings (6 to 24+ units) factory-built in Quebec.
Visit websiteCommercial partnership — we may receive compensation. Disclosure
To compare manufacturers active in Quebec, see our modular builders guide.
